samastqa.50hertz.in,samast-api-gateway:8766
samastqa.50hertz.in,samast-api-gateway:8766
Punjab State Load Dispatch Centre
Punjab State Transmission Corporation Limited
Welcome
Profile
Logout
Download Full Document List
Entity Type
State Owned Generating Station
IPP
CPP
Co-Gen
NRSE/Renewable
Distribution-Licensee
Deemed-Distribution-Licensee
Full Open Access Consumer
Partial Open Access Consumer
Other
Entity Details
Name of the Entity:
*
Mobile:
*
Phone:
Primary Email:
*
Primary business(brief description):
Business/Work Address:
*
Registered Address:
*
Postal Address:
*
GST NO:
*
PAN No:
*
Website:
Contact Person Scheduling
Name:
*
Designation:
*
Mobile:
*
Phone:
Email:
*
Contact Person DSM and Billing
Name:
*
Designation:
*
Mobile:
*
Phone:
Email:
*
NCPD Quantum(MW) (For Buyers)
NCPD Qtm (MW):
*
License Details (for licensee) (copy enclosed)
License No:
Validity:
License Date:
Issuing Authority:
Connectivity Details(Details at point of injection/drawl)
Name of Utility:
*
-Select-
PSPCL
PSTCL
Other
Voltage Level (kV):
*
-Select-
11
33
66
132
220
400
Installed Capacity:
Sanctioned CD:
*
-Select-
MW
MVA
Point of inj./drawl(PSTCL/PSPCL):
*
Details of Generator (Unit-wise)
Units
Installed Capacity(MW)
*
COD
(dd-mm-yyyy)
*
Auxiliary Consumption(%)
*
Ramp Up Rate (MW/min)
*
Ramp Down Rate (MW/min)
*
Min. Technical Limit(%)
*
Max. Technical Limit(%)
*
Action
1
Total IC :
*
Details of Beneficiary & Drawl Point:
*
Type of Generating Units :
*
Type of Fuel Used:
*
FGMO Service:
*
Yes
No
RGMO Service :
*
Yes
No
FGD Compliance:
*
Yes
No
Exportable Capacity (MW):
*
Type of Generator:
*
-Select-
Thermal
Hydro
Other
Type of Cooling:
*
Type of Hydro:
*
Type of Turbine Used:
*
Status of Metering Infrastructure
Is Metering Infrastructure Placed ?
*
Yes
No
Metering Details
Meter Type
Meter No.
Meter Make
Interface Point
CT Ratio
PT Ratio
Multiplying Factor
Main Meter
*
Check Meter
Stand-By Meter
Existing Open Access Details (Agreement/Approval copy enclosed)
New
Existing
Sr No.
Type
*
Contracted Entity
*
Capacity(MW)
*
Validity
*
Action
1
-Select-
LTA
MTOA
STOA
Existing PPA/PSA Access Details Other Than Above (Copy enclosed)
Sr No.
Contracted Entity
*
Capacity(MW)
*
Validity
*
Action
1
Details Of Registration Fee
RTGS/NEFT No:
*
Fee Amount:
GST Amount:
Total Amount:
Details of LC/LM (No.& date)
LC/LM No:
LC/LM Date:
Bank Account Details Of State Entity for Handling DSM Mechanism
Account No:
*
Name of the Bank:
*
IFSC Code:
*
Branch:
*
Captcha
*
Upload Document
Upload Documents
×
Undertaking/ Affidavit
*
Copy of Board Resolution
*
Copy of Single Line Diagram
*
Copy of PAN
*
Copy of GST
*
Copy of existing LTA/ MTOA agreement/ STOA approval
*
Copy of Existing PPA
*
Copy of Feasibility and CEI clearance and COD (Commercial Operation Date) certificate with date and time of COD for each generator unit
*
Copy of Capability Curve details and OEM Certificate
*
Copy of Technical data of generating units (Pertaining to Ramp up, Ramp down, Technical minimum, FGMO/RGMO, FDP etc)
*
Copy of PEDA clearance/implementation agreement
*
Load Curve Data for last 3 years
*
Bank Receipt for Registration Fees
*
Bank Receipt for LC/LM
Any Other Document
Cancel
Save As Draft
Submit
Developed and Maintained by 50 Hertz Limited
×
Delete
Are you sure you want to delete this
?
×
Delete
Are you sure you want to delete this
?
×
Delete
Are you sure you want to delete this
?
×
Delete
Are you sure you want to delete this
?
×
Delete
Are you sure you want to delete this
Tariff Charge
?
Color Schemes
Header
(A). Light
Navigation